1 I've roughed in the condensation drain for the split A/C system from the upstairs bedroom |
2 Most of the plubing and wiring is now complete |
3 Al lthe floor tiles are down. |
4 Installing the fibreboard was pretty straight forward in the wet areas. |
5 I'm installing two flush mounted LED ceiling lights obove the vanity. |
6 It was a bit of a job to hide the switch wiring. |
13 |
14 SOme outlets for network and TV antenna cabling. |
15 |
16 Re-routing of the shower plumbing was a an easy item. |
17 I set the shower mixer tap at the entrance to the shower for ease of use. |