1 After I got divorced, I went looking for a house and thought that I would want to build a new one on this block.
2 I decided to go with High Desert Construction, but after the plans were drawn, they had made a few changes which killed the deal.
3 Both the Agent and the Builder were real keen in wanting me to sign on the dotted line without looking at the plans. My initial offer was to pay $155,000 (plus $35k for the lot) for a 2500 square foot house, of which 700 square feet was to be finished by me. The revised plans came in at 1800 square feet with me finish 500 square feet.
4 They also omitted all tile, hardwood flooring, low E windows and window coverings that were promised and written into the original contract. I was furious that they were trying to bait and switch me on what is the largest purchase anyone will ever make. Funnily enough, I had no dramas in letting them know.