1 I've installed new plumbing, sewer and 1500 feet of new wiring before installing the sheetrock. |
2 The black wire you see is the low voltage under-cabinet lighting I'm adding for the work spaces. |
3 Where the old basement entrance way used to be now has the fridge and ice maker plumbing. |
4 |
| |