1 Stage 3 of the remodel was to install the air cell insulation, as witnessed by the blue coloured walls. |
2 The contrasting silver colour is the Sisolation vapour barrier/house wrap I installed yesterday. |
3 The two large areas of silver foil is waiting in me to terminate the network cabling for the new security cameras. |
4 |
| |