7Goldsworthy LL 2ndBedroom 2009DEC11 001  Yeah, it looks like a bomb went off, but I'm finally putting up 6mm "Ridgeline" fibre-cement panelling for the exterior walls. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, December, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009DEC11 002  As you can see, it looks pretty good once it is up, but there was a fair amount of effort getting it up without it looking bodgey. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, December, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009DEC11 003  I decided to panel the brickwork to have a neat uniform look across the house. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, December, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009DEC11 004  One issue I ran into was the concrete support pillar was 22 millimeters out of plumb. The best way to resolve it was to grind it away. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, December, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009DEC11 005  Two and a half hours on the grinder and the pillar is plumb. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, December, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009DEC11 006  You'll notice the roll of air-cell insulation on the ground. I've installed it on all the newly built areas, to save on energy costs. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, December, QLD, Townsville